Row houses in Mārupe
Ritenieku Street 1, Vētras, Mārupe Municipality
Marupe
Peace and nature
Mārupe, as a haven of peace on the outskirts of the capital, has long attracted those thirsty for fresh air, silence, and a green, orderly environment.
The most powerful region
Mārupe is not big, but it is powerful – data from the Central Statistical Bureau shows that in 2021, the highest gross domestic product per capita in Latvia was in Mārupe municipality, surpassing not only Riga, but even countries such as Kuwait and South Korea!
Small-town charm
Before World War II, Mārupe parish was the smallest, but most densely populated parish in Riga County, and even today, the charm of a small town, vast rural landscapes, combined with the proximity of the Riga center, allow Mārupe to be one of the most desirable places to live near Riga.

3.5 km
T/C Spice
5 km
Old Town
1.6 km
Airport
Benefits of living in a row house in Marupe
Heated floors in all rooms
Two parking spaces
Ventilation with heat recovery
Private plot of land
Auxiliary rooms
Closed area
Technical details
Constructions
Engineering networks
Basics
Monolithic reinforced concrete strip foundations
Exterior walls
Aerated concrete block Bauroc ECOTERM+ 375 and 50mm EPS insulation
Interior partitions
W112 Knauf metal frame partition wall with additional sound insulation and double cladding layer
Roof
Flat roof construction made of wooden roof trusses, PVC membrane and 400mm insulation with ecowool.
Windows
Rehau SYNEGO AD energy-efficient PVC structural windows with increased thermal insulation and Roto NX fittings and triple glazing.
Front door
Aluminum construction exterior doors with a three-point lock.
Area around the house
Paved driveway and parking spaces, fenced area, storage room, terrace.
Heating
heat pump
Ventilation
recuperation system
Water
borehole with filters
Sewerage
biological treatment septic tank
Project development
2024–2025
Planning stage
Work has begun on project development and obtaining necessary permits.
2025–2026
Construction stage
The foundations of the building have been completed and the building frame is ready, the remaining work continues.
2026
Planned to be put into operation
The foundations of the building have been completed and the building frame is ready, the remaining work continues.
2026
Commissioned
The foundations of the building have been completed and the building frame is ready, the remaining work continues.
2026
Ready to use
The foundations of the building have been completed and the building frame is ready, the remaining work continues.