Contact
Place
Housing plans
Demo apartment
Benefits
Technical details
Project development

Marupe

Peace and nature

Mārupe, as a haven of peace on the outskirts of the capital, has long attracted those thirsty for fresh air, silence, and a green, orderly environment.

The most powerful region

Mārupe is not big, but it is powerful – data from the Central Statistical Bureau shows that in 2021, the highest gross domestic product per capita in Latvia was in Mārupe municipality, surpassing not only Riga, but even countries such as Kuwait and South Korea!

Small-town charm

Before World War II, Mārupe parish was the smallest, but most densely populated parish in Riga County, and even today, the charm of a small town, vast rural landscapes, combined with the proximity of the Riga center, allow Mārupe to be one of the most desirable places to live near Riga.

3.5 km

T/C Spice

5 km

Old Town

1.6 km

Airport

Project Visualization

Benefits of living in a row house in Marupe

Heated floors in all rooms
Two parking spaces
Ventilation with heat recovery
Private plot of land
Auxiliary rooms
Closed area

Technical details

Constructions
Engineering networks
Basics

Monolithic reinforced concrete strip foundations

Exterior walls

Aerated concrete block Bauroc ECOTERM+ 375 and 50mm EPS insulation

Interior partitions

W112 Knauf metal frame partition wall with additional sound insulation and double cladding layer

Roof

Flat roof construction made of wooden roof trusses, PVC membrane and 400mm insulation with ecowool.

Windows

Rehau SYNEGO AD energy-efficient PVC structural windows with increased thermal insulation and Roto NX fittings and triple glazing.

Front door

Aluminum construction exterior doors with a three-point lock.

Area around the house

Paved driveway and parking spaces, fenced area, storage room, terrace.

Heating

heat pump

Ventilation

recuperation system

Water

borehole with filters

Sewerage

biological treatment septic tank

Project development

2024–2025

Planning stage

Work has begun on project development and obtaining necessary permits.

2025–2026

Construction stage

The foundations of the building have been completed and the building frame is ready, the remaining work continues.

2026

Planned to be put into operation

The foundations of the building have been completed and the building frame is ready, the remaining work continues.

2026

Commissioned

The foundations of the building have been completed and the building frame is ready, the remaining work continues.

2026

Ready to use

The foundations of the building have been completed and the building frame is ready, the remaining work continues.

Contact us

Do you have questions about our projects, would you like to receive a quote or simply find out more information? We are ready to help! Fill out the contact form and our team will contact you as soon as possible.